Technic Tumbleplater Example Lines


Zinc line

TTP10-100 - alkaline zinc with chromate

Featuring multi-station zinc tank, shuttles, short process exit for baking, inline chromating and drying. Parts deposited into totes or boxes ready for shipping.
Production capability: 700 lbs. an hour with 24-minute zinc plating time. (Approximately 30% faster than conventional barrel zinc processing.)

Cetyl Lube line

TTP5-70 - cetyl lubrication line

Four-station cetyl lubrication line featuring skip choice of lubrication tank, in-line dryer and cool down conveyor. Included station enclosures and custom covers.

Photo shows line installed and running production.

Proprietary process

TTP5-70 - proprietary chemical process

Straight line process with cool down conveyor exiting to one side. Included in-line drying after process. Optional station enclosures and custom covers.

© 2003-2004 Technic, Inc. All Rights Reserved.  Site Terms & Conditions
Chemistry
Equipment
Powders
Applications
Company
News
Contact
Resources
For chemistry and equipment,
Technic has the solutions!